Firing Systems

Institute of Combustion and Power Plant Technolgy

Experimental and theoretical investigations of energy and material conversion in power plants and industrial facilities.

Activities

The work in the department „Firing Systems” is engaged in experimental and theoretical research on energy and material conversion in power plants and industrial facilities. For this purpose, a variety of experimental facilities is available at IED. Our own workshop allows to modify the facilities according to the needs of each specific research project. Furthermore, a fully equipped laboratory for materials and chemical analysis provides the opportunity to investigate physical and chemical processes. This enables direct collaboration between basic and applied research. At the same time, theoretical model approaches for monitoring and evaluating individual and overall processes are developed. The theoretical models are validated and further developed on the basis of experimentally obtained data.

In addition to the work performed in the laboratory and pilot plant, problem-specific measurements are frequently planned and carried out in large-scale plants. Extensive measurement techniques, proven in power plant operations, are available for this purpose at the IED.

 

KSVA combustion chamber
KSVA combustion chamber
  • Carbon-free energy sources and storage (e.g., H2, metals, ammonia)
  • Highly efficient carbon capture processes (oxyfuel and post-combustion)
  • Utilization of biomass and waste materials in thermal processes
  • Refining and utilization of complex waste materials and fuels
  • Development and testing of plant components for process optimization
  • Pollutant formation and reduction in combustion processes (NOx, SO₂, heavy metals, fine particulate matter)
  • Characterization of slagging/fouling and corrosion in high- and low-temperature combustion systems
  • Investigations into operational problems in power plants and industrial processes (ignition, burn-out, deposits, corrosion)
  • Characterization and utilization of residual materials (fly ash, gypsum)
  • Development and testing of analytical and testing standards (CEN, DIN)

Research Projects

Current Projects
 

METES is an RFCS project aiming to investigate the use of metals as potential energy storage media. Due to the increasing share of renewable energy sources with fluctuating availability, long-term storage solutions are needed to balance supply and demand. The METES project is researching the use of iron, aluminum, magnesium, and silicon as CO₂-free, circular energy carriers to replace fossil fuels such as hard coal and lignite in steam power plants. Metals offer high volumetric energy density and safe storage. Another major advantage is that the heat release process closely resembles that of pulverized coal combustion, which would allow for the continued use of existing coal infrastructure. To verify this, the aforementioned metals are being experimentally tested for their combustion properties. Based on these results, the combustion processes are modeled and validated using CFD models. The technology’s potential is demonstrated using detailed retrofit scenarios for real power plants. The project’s goal is to advance the technology from TRL 2–3 to TRL 4–5 and to demonstrate its technical, economic, and environmental feasibility in order to derive concrete recommendations for policymakers and industry.

Project Team: D. Yalıç, C. Baum, J. Maier

Test Facilities: BTS, REM, TGA, Gas Analysis, Fuel Analysis

Project Start: October 1, 2026, Duration: 36 months

Funding: Research Fund for Coal and Steel (RFCS)

Subproject: Further development and demonstration of sorption-assisted gasification of biomass for the direct reduction of iron ore, as well as analyses of system integration

Steel forms the backbone of the modern world. However, the iron and steel sector accounts for about 8 % of global final energy consumption and roughly 7 % of total CO2 emissions from the energy sector. Direct reduced iron (DRI) furnaces are increasingly viewed as a viable and more sustainable alternative. Current DRI processes, however, still rely on methane, a fossil fuel that is reformed to produce H2 and CO as reducing agents. Replacing methane with green hydrogen in the DRI process holds the greatest potential for a significant reduction in CO2 emissions. Sorption-Enhanced Gasification (SEG) is an innovative technology that utilizes two interconnected reactors: a gasifier to produce synthesis gas and a combustor to provide the heat necessary for gasification. Hydrogen produced from biomass or waste using SEG represents a promising solution that combines waste utilization with the further decarbonization of the steel industry. The project focuses on integrating an SEG process to convert biomass and waste fuels into hydrogen-rich synthesis gas for the DRI process at a TRL of 6/7. This initiative is complemented by the effective utilization of the separated CO2 stream. In addition, the approach supports the circular economy through the recovery and utilization of byproducts, including solid biochar for battery applications, CaO for reuse in electric arc furnaces (EAF), and vitrified slag as construction materials. As part of this project, the IED will focus on the use of oxy-SEG gasification to produce a hydrogen-rich synthesis gas (with over 60% on a dry basis) in the gasifier and achieve CO2 recovery of over 90% from the burner exhaust stream.

Contact Persons: I. Kumar, A. Neuwirth, C. Schmidberger, C. Baum, J. Maier

Project Start: 01.01.2026, duration: 36 months

Funding: Clean Energy Transition Partnership (CETP)

Joint Project: PARCO2UR – Combining Amin Scrubbing and Knallgas Fermentation for CO2 Capture and Oleic Acid Synthesis at Waste-to-Energy Plants

Subproject: Experimental investigation of an amine scrubbing pilot plant and measures to optimize the process under realistic and technically relevant conditions

As part of this project, the capture and utilization of CO2 from the flue gases of waste-to-energy plants will be tested and optimized by combining amine scrubbing and knallgas fermentation technologies. To this end, CO2 capture at a waste-to-energy plant using alternative amines and the biological utilization of CO2 via knallgas fermentation will be tested on a pilot scale. The findings will be used to scale up the process and identify opportunities for a carbon recycling economy. The Institute for Energy Process Engineering and Dynamics in Energy Systems (IED) at the University of Stuttgart will scientifically evaluate and monitor the installed amine scrubbing pilot plant at the waste-to-energy plant of Stadtreinigung Hamburg under realistic conditions and, in addition, experimentally investigate measures for process optimization at its own technically relevant pilot plant. In addition to these measurements, the oxy-enriched process will be investigated as a means of increasing overall efficiency on a semi-technical scale, and alternative combustion concepts will be tested in combination with amine scrubbing. To this end, waste incineration tests with an increased oxygen concentration in combination with a CC unit will be conducted on a modified grate combustion system at the IED’s pilot plant.

Contact persons: F. Koorang Beheshti, E. Miller, J. Maier, C. Baum

Test facility: ROFEA

Beginning: 01.01.2026, duration: 36 months

Project partner: University of Stuttgart – IED, Stadtreinigung Hamburg, Colipi

Funding: Federal Ministry for Economic Affairs and Energy, Project website 

Subproject: Evaluation and prediction of deposition down to the cold end of the flue gas path in thermal power plants based on experiments, model development, and simulation

The VeRa project endeavors to further improve the predictive capacity of an engineering prediction tool and CFD sub models to validate the phenomena of slagging and fouling in boilers. It additionally seeks to study the buildup of condensates of water soluble corrosive phases resulting from biogenic (including bio-residues) and coal mixtures with high shares of biogenic fuels. The objective is to better understand the precursor boundary conditions for slagging and fouling from radiative, convective and cold end regions along the flue gas path of a combustion chamber. This is to facilitate the combustion of high fractions of biomass in co-firing scenarios, application of additive in combustion and even in cases of a complete substitution of coal with biomass in boilers (i.e 100% biomass combustion). These goals will be realized through an improved version of a deposition probe being developed and optimized at the institute. Validated engineering prediction tool complimented by high precision CFD sub models, thermochemical Oxide-Salt databank and as well as integrated slow reaction defining kinetics of salt condensation will form a reliable means to minimize problematic slagging and fouling events by optimally suggesting fuel mixtures and specifications based on fuel quality and operational boundary conditions of boilers.

Model development of both CFD and an engineering prediction tool for slagging and fouling are aided by series of test campaigns, methodical measurement and extensive data analysis in Labs and pilot scale facilities. Elaborate measurement campaigns in four different power plant boilers will provide the validation and prediction potentials of slagging and fouling for industry scale utility boilers.

The project is funded by BMWi (Federal Ministry of Economics and Technology) in close collaboration with active industry partners.

 

Contact persons:  A. Suso, P. Plaza, E. Miller, J. Maier, C. Baum

Test facility: KSVA, BTS, REM, Gas analytics, fuel analytics, Fuel scale measurement campaigns 

Beginning: 01.02.2021, duration: 48 months

In the PRIDE-ID project, a technology that uses a compressed hot potassium carbonate solution to capture CO₂ is being employed to capture unavoidable emissions using actual process gases at a Holcim GmbH cement plant. The carbonate scrubbing process was developed as an innovative, cost-effective CO₂ capture technology. The project involved the technical and economic investigation and validation of the technical fundamentals of the CapsolEoP® technology (pilot plant) for CO₂ capture as an “end-of-pipe” solution. The goal of the PRIDE-ID project was to investigate the technology in a real-world cement industry setting—specifically, in a bypass configuration—where a partial stream of the flue gas flow was processed in the pilot plant. For testing purposes, a mobile CO₂ capture unit with a capacity of approximately 1.5 metric tons per day was integrated into the Dotternhausen plant and tested over several months. The IED assumed project management and provided scientific support for the implementation of the capture technology. The Institute for Non-Classical Chemistry e.V. characterizes the active components and their aging products in the potassium carbonate solution and identifies the mechanisms of the aging reactions.

 

Contact persons: A. Mohamed, C. Kroumian, S. Grathwohl, J. Maier, C. Baum

Test facility: KSVA, BTS, Gas analytics, Measurements at the cement plant

Beginning: 01.01.2023, duration: 36 months

Funding: Federal Ministry for Economic Affairs and Energy

GreenDEALCO2 is an RFCS project that investigates new perspectives for the coal industry given the decision to phase out coal in Europe. The project examines sustainable reuse concepts for decommissioned coal-fired power plant sites. The goal is to utilize the existing infrastructure for the production of green e-fuels. This involves developing concepts and evaluating them based on techno-economic analyses. For the most promising production pathways, potential certification concepts are being developed to verify the quality and sustainability of the e-fuels. In addition, social aspects—such as job generation—are also taken into account for the repurposing scenarios. Furthermore, surveys are being conducted to assess public knowledge of and acceptance toward e-fuels.

A second important part of the project is the investigation of alternative fuels, such as hydrogen, ammonia, and metals. These carbon-free energy carriers could be used in large power plants to serve as a CO₂-free reserve and for grid stabilization. The findings from the project are intended to serve as business and policy recommendations in Europe.

 

Project Team: C. Baum, J. Maier

Test Facility: BTS, REM, Gas Analysis, Fuel Analysis

Project Start: July 1, 2021, Duration: 36 months

Funding: Research Fund for Coal and Steel (RFCS)

The AC²OCem project aims to advance the decarbonization of European industry by integrating oxyfuel technology into the cement industry as a cost-effective solution for carbon capture. With the goal of shortening the time to market for oxyfuel technology in the cement sector, the project worked to advance the key components of oxyfuel cement plants to TRL 6 by conducting a series of pilot tests and several detailed analytical studies. This made it possible to support and accelerate the large-scale oxyfuel demonstration plants with the prospect of nearly CO₂-free cement production. As part of the AC²OCem project, first-generation oxyfuel technology for retrofitting existing plants was investigated, with a focus on optimizing the operation of the oxyfuel calciner and further developing kiln burner technology for the combustion of 100% alternative fuels, including a high proportion of biogenic fuels. This work is complemented by a techno-economic analysis aimed at developing guidelines for retrofitting existing cement plants with oxyfuel technology.

The innovative second-generation oxyfuel technology for new cement plants without flue gas recirculation was investigated, enabling a step up from TRL2 to TRL6 for key technological components. A novel oxyfuel kiln burner designed for stoichiometric combustion and an oxygen supply of up to 100 % is being developed and tested in a pilot plant that simulates the conditions of a cement kiln. As part of AC²OCem, the IED contributed its expertise and knowledge in the field of oxyfuel technology and the combustion of alternative fuels to integrate these technologies into the cement industry. The IED acted as coordinator of the AC²OCem project and led two work packages. Experimental studies on oxyfuel burner technology were conducted in a pilot plant at TRL 6, along with tests on first-generation technology involving the combustion of 100 % alternative fuels and on second-generation oxyfuel technology involving the combustion of up to 100 % oxygen. Tests were conducted in a technically full-scale cross-flow reactor, which corresponds to cement calciners, to evaluate and optimize the influence of altered flue gas atmospheres on the calcination process.

 

Contact persons: C. Kroumian, M. Paneru, J. Maier, C. Baum

Test facility: KSVA, BTS, Gas analytics, Fuel analytics

Beginning: 01.10.2019, duration: 36 months

Funding: Federal Ministry for Economic Affairs and Climate Action / ACT – Programm (Accelerating CCS Technologies; https://ac2ocem.eu-projects.de/)

Research Project: Adapting the Oxy-Fuel and Oxy-SEG Processes to the Requirements of Waste Treatment

The NuCA project aims to investigate technologies that enable the increased material recovery of suitable municipal solid waste fractions while simultaneously capturing the CO2 emitted during the energy recovery of the remaining municipal solid waste fraction. To this end, both the Oxy-SEG process and Oxy-Fuel combustion will be optimized and demonstrated for the use of SRF (municipal solid waste fractions). The residues remaining after gasification—which contain partially concentrated pollutants from the municipal waste, as well as any untreated municipal waste—are incinerated in an Oxy-Fuel grate furnace. The flue gas produced in this process consists almost entirely of CO2 and can now be utilized or stored. Oxy-Fuel grate combustion also generates heat and electricity, thereby utilizing the energy contained in the treated waste. Electricity and heat can also be generated (on a smaller scale) through Oxy-SEG gasification. In this way, the technologies investigated in NuCA can offer an optimal solution for treating waste more sustainably (by returning raw materials to the economic cycle) and decarbonizing waste treatment.

 

Contact persons: A. Mack, J. Maier, C. Baum

Test facility: ROFEA

Beginning: 01.12.2019, duration: 36 months

The main objective of the research project is to investigate, for the first time, the technical and economic feasibility of using hydrogen in the cement manufacturing process within the calciner. The working hypothesis for this project is that the use of hydrogen in cement production can contribute to a significant reduction in CO₂ emissions at a lower cost compared to other technologies.  The goal of this research project is to systematically investigate, for the first time, the effects of using hydrogen in the cement manufacturing process within the calciner with regard to operational management, the required plant technology, product properties, and emissions. The aim is to demonstrate the technical and economic conditions under which hydrogen can be used in the cement production process within the calciner to further reduce CO₂ emissions and energy consumption in the cement industry in the medium term. The approach to achieving this consists of a combination of laboratory and pilot-scale tests on H₂ use, as well as a simulation of the clinker burning process on an industrial scale.

IGF Project 21748 N is funded by the Federal Ministry for Economic Affairs and Climate Action through the AiF as part of the Program for the Promotion of Industrial Collaborative Research (IGF), based on a resolution of the German Bundestag.

Contact persons: E. Miller, S. Grathwohl
Test facilities: BTS-VR, TGA
Beginning: 01.04.2021, duration: 39 months

Carbon-free Energy Sources and Storage Systems
 

METES is an RFCS project aiming to investigate the use of metals as potential energy storage media. Due to the increasing share of renewable energy sources with fluctuating availability, long-term storage solutions are needed to balance supply and demand. The METES project is researching the use of iron, aluminum, magnesium, and silicon as CO₂-free, circular energy carriers to replace fossil fuels such as hard coal and lignite in steam power plants. Metals offer high volumetric energy density and safe storage. Another major advantage is that the heat release process closely resembles that of pulverized coal combustion, which would allow for the continued use of existing coal infrastructure. To verify this, the aforementioned metals are being experimentally tested for their combustion properties. Based on these results, the combustion processes are modeled and validated using CFD models. The technology’s potential is demonstrated using detailed retrofit scenarios for real power plants. The project’s goal is to advance the technology from TRL 2–3 to TRL 4–5 and to demonstrate its technical, economic, and environmental feasibility in order to derive concrete recommendations for policymakers and industry.

Project Team: D. Yalıç, C. Baum, J. Maier

Test Facilities: BTS, REM, TGA, Gas Analysis, Fuel Analysis

Project Start: October 1, 2026, Duration: 36 months

Funding: Research Fund for Coal and Steel (RFCS)

Subproject: Further development and demonstration of sorption-assisted gasification of biomass for the direct reduction of iron ore, as well as analyses of system integration

Steel forms the backbone of the modern world. However, the iron and steel sector accounts for about 8 % of global final energy consumption and roughly 7 % of total CO2 emissions from the energy sector. Direct reduced iron (DRI) furnaces are increasingly viewed as a viable and more sustainable alternative. Current DRI processes, however, still rely on methane, a fossil fuel that is reformed to produce H2 and CO as reducing agents. Replacing methane with green hydrogen in the DRI process holds the greatest potential for a significant reduction in CO2 emissions. Sorption-Enhanced Gasification (SEG) is an innovative technology that utilizes two interconnected reactors: a gasifier to produce synthesis gas and a combustor to provide the heat necessary for gasification. Hydrogen produced from biomass or waste using SEG represents a promising solution that combines waste utilization with the further decarbonization of the steel industry. The project focuses on integrating an SEG process to convert biomass and waste fuels into hydrogen-rich synthesis gas for the DRI process at a TRL of 6/7. This initiative is complemented by the effective utilization of the separated CO2 stream. In addition, the approach supports the circular economy through the recovery and utilization of byproducts, including solid biochar for battery applications, CaO for reuse in electric arc furnaces (EAF), and vitrified slag as construction materials. As part of this project, the IED will focus on the use of oxy-SEG gasification to produce a hydrogen-rich synthesis gas (with over 60% on a dry basis) in the gasifier and achieve CO2 recovery of over 90% from the burner exhaust stream.

Contact Persons: I. Kumar, A. Neuwirth, C. Schmidberger, C. Baum, J. Maier

Project Start: 01.01.2026, duration: 36 months

Funding: Clean Energy Transition Partnership (CETP)

GreenDEALCO2 is an RFCS project that investigates new perspectives for the coal industry given the decision to phase out coal in Europe. The project examines sustainable reuse concepts for decommissioned coal-fired power plant sites. The goal is to utilize the existing infrastructure for the production of green e-fuels. This involves developing concepts and evaluating them based on techno-economic analyses. For the most promising production pathways, potential certification concepts are being developed to verify the quality and sustainability of the e-fuels. In addition, social aspects—such as job generation—are also taken into account for the repurposing scenarios. Furthermore, surveys are being conducted to assess public knowledge of and acceptance toward e-fuels.

A second important part of the project is the investigation of alternative fuels, such as hydrogen, ammonia, and metals. These carbon-free energy carriers could be used in large power plants to serve as a CO₂-free reserve and for grid stabilization. The findings from the project are intended to serve as business and policy recommendations in Europe.

 

Project Team: C. Baum, J. Maier

Test Facility: BTS, REM, Gas Analysis, Fuel Analysis

Project Start: July 1, 2021, Duration: 36 months

Funding: Research Fund for Coal and Steel (RFCS)

The main objective of the research project is to investigate, for the first time, the technical and economic feasibility of using hydrogen in the cement manufacturing process within the calciner. The working hypothesis for this project is that the use of hydrogen in cement production can contribute to a significant reduction in CO₂ emissions at a lower cost compared to other technologies.  The goal of this research project is to systematically investigate, for the first time, the effects of using hydrogen in the cement manufacturing process within the calciner with regard to operational management, the required plant technology, product properties, and emissions. The aim is to demonstrate the technical and economic conditions under which hydrogen can be used in the cement production process within the calciner to further reduce CO₂ emissions and energy consumption in the cement industry in the medium term. The approach to achieving this consists of a combination of laboratory and pilot-scale tests on H₂ use, as well as a simulation of the clinker burning process on an industrial scale.

IGF Project 21748 N is funded by the Federal Ministry for Economic Affairs and Climate Action through the AiF as part of the Program for the Promotion of Industrial Collaborative Research (IGF), based on a resolution of the German Bundestag.

Contact persons: E. Miller, S. Grathwohl
Test facilities: BTS-VR, TGA
Beginning: 01.04.2021, duration: 39 months

Carbon Capture / CO2-Reduction
 

Joint Project: PARCO2UR – Combining Amin Scrubbing and Knallgas Fermentation for CO2 Capture and Oleic Acid Synthesis at Waste-to-Energy Plants

Subproject: Experimental investigation of an amine scrubbing pilot plant and measures to optimize the process under realistic and technically relevant conditions

As part of this project, the capture and utilization of CO2 from the flue gases of waste-to-energy plants will be tested and optimized by combining amine scrubbing and knallgas fermentation technologies. To this end, CO2 capture at a waste-to-energy plant using alternative amines and the biological utilization of CO2 via knallgas fermentation will be tested on a pilot scale. The findings will be used to scale up the process and identify opportunities for a carbon recycling economy. The Institute for Energy Process Engineering and Dynamics in Energy Systems (IED) at the University of Stuttgart will scientifically evaluate and monitor the installed amine scrubbing pilot plant at the waste-to-energy plant of Stadtreinigung Hamburg under realistic conditions and, in addition, experimentally investigate measures for process optimization at its own technically relevant pilot plant. In addition to these measurements, the oxy-enriched process will be investigated as a means of increasing overall efficiency on a semi-technical scale, and alternative combustion concepts will be tested in combination with amine scrubbing. To this end, waste incineration tests with an increased oxygen concentration in combination with a CC unit will be conducted on a modified grate combustion system at the IED’s pilot plant.

Contact persons: F. Koorang Beheshti, E. Miller, J. Maier, C. Baum

Test facility: ROFEA

Beginning: 01.01.2026, duration: 36 months

Project partner: Universität Stuttgart – IED, Stadtreinigung Hamburg, Colipi

Funding: Federal Ministry for Economic Affairs and Energy, Project website

The main objective of the research project is to investigate, for the first time, the technical and economic feasibility of using hydrogen in the cement manufacturing process within the calciner. The working hypothesis for this project is that the use of hydrogen in cement production can contribute to a significant reduction in CO₂ emissions at a lower cost compared to other technologies.  The goal of this research project is to systematically investigate, for the first time, the effects of using hydrogen in the cement manufacturing process within the calciner with regard to operational management, the required plant technology, product properties, and emissions. The aim is to demonstrate the technical and economic conditions under which hydrogen can be used in the cement production process within the calciner to further reduce CO₂ emissions and energy consumption in the cement industry in the medium term. The approach to achieving this consists of a combination of laboratory and pilot-scale tests on H₂ use, as well as a simulation of the clinker burning process on an industrial scale.

IGF Project 21748 N is funded by the Federal Ministry for Economic Affairs and Climate Action through the AiF as part of the Program for the Promotion of Industrial Collaborative Research (IGF), based on a resolution of the German Bundestag.

Contact persons: E. Miller, S. Grathwohl
Test facilities: BTS-VR, TGA
Beginning: 01.04.2021, duration: 39 months

In the PRIDE-ID project, a technology that uses a compressed hot potassium carbonate solution to capture CO₂ is being employed to capture unavoidable emissions using actual process gases at a Holcim GmbH cement plant. The carbonate scrubbing process was developed as an innovative, cost-effective CO₂ capture technology. The project involved the technical and economic investigation and validation of the technical fundamentals of the CapsolEoP® technology (pilot plant) for CO₂ capture as an “end-of-pipe” solution. The goal of the PRIDE-ID project was to investigate the technology in a real-world cement industry setting—specifically, in a bypass configuration—where a partial stream of the flue gas flow was processed in the pilot plant. For testing purposes, a mobile CO₂ capture unit with a capacity of approximately 1.5 metric tons per day was integrated into the Dotternhausen plant and tested over several months. The IED assumed project management and provided scientific support for the implementation of the capture technology. The Institute for Non-Classical Chemistry e.V. characterizes the active components and their aging products in the potassium carbonate solution and identifies the mechanisms of the aging reactions.

 

Contact persons: A. Mohamed, C. Kroumian, S. Grathwohl, J. Maier, C. Baum

Test facility: KSVA, BTS, Gas analytics, Measurements at the cement plant

Beginning: 01.01.2023, duration: 36 months

Funding: Federal Ministry for Economic Affairs and Energy

CEMCAP is an Horizon 2020 project regarding CCS technology development for cement production. IED’s department Firing Systems is involved in the design, testing and optimization of an oxy-fuel burner as well as in the experimental investigation of entrained flow calcination under oxy-fuel conditions. The Decentralized Energy Conversion department of the IFK is also involved in the project with investigations on the Calcium Looping process.

Contact persons: F. Carrasco, J. Maier
Test Facilities: BTS-VR, KSVA
Beginning: 01.05.2015, time: 48 months

The main objective of the EU RFCS project BiOxySorb is an experimental and techno-economic assessment of 1st and 2nd generation biomass co-combustion under both air- and oxy-fuel conditions at various co-combustion ratios in combination with flexible, low cost SOx, HCl and Hg emission control by sorbent injection. The project is administered and technically coordinated by IED.

Contact persons:  R. Spörl, J. Maier, A. Fuller
Test Facilities: KSVA, BTS-VR
Beginning: 01.07.2013, time: 36 months

In the EU FP7 research project, IED is involved in fuel, flame and combustion characterization and investigations of high temperature gas-side corrosion, flue gas clean-up and the behavior of mercury under oxy-fuel combustion conditions.

Contact persons:  M. Escoto de Tejada, J. Maier
Test Facilities: BTS-VR, KSVA
Beginning: 01.12.2011, time: 48 months

In this German federal research project, IED investigates the influence of fuel composition and combustion conditions (air, oxy-fuel) on deposit and ash formation and transformation. Moreover, interactions between flue gases, deposits and heat exchanger materials are being evaluated.

Contact persons:  R. Spörl, M. Paneru
Test Facilities: KSVA, BTS-VR
Beginning: 01.04.2011, time: 36 months

The project is administered and technically coordinated by IED. Major RTD topic is influence of supercritical steam parameters and the combustion atmosphere on the new state-of-the-art evaporator and superheater materials in both conventional air and oxy-fuel firings.

Contact persons:   G. Stein-Brzozowska,  O. Lemp, J. Maier
Test Facilities: KSVA, laboratory tests, long-time expositions, field measurements in power plants
Beginning: 01.01.2007, time: 4 years

The project aims at technologies that meet the target of at least a 90% CO2-capture rate. IED, as one of the major RTD providers, focuses on the operation and emission formation under Oxyfuel process conditions up to a scale of 500 kW.

Contact person:  J. Maier
Test Facilities: KSVA, BTS-VR
Beginning: 01.03.2004, time: 5 years

Investigation of the physicochemical procedures during the transformation of the coal minerals and the reduction of fouling and slagging tendencies at the superheater tubes of modern power plants.

Contact person: S. Babat ,  O. Lemp
Test facilities: KSVA,  Power plants
Beginning: 01.01.2009, time: 4 years

The project is administered and technically coordinated by IED. Major RTD topics are combustion tests with different burner set-ups and validation and evaluation of burner set-ups (up to a scale of 30 MW) by using the IED CFD combustion model AIOLOS.

Contact persons:  S. Grathwohl, J. Maier
Test Facilities: KSVA, BTS-VR
Beginning: 01.07.2006, time: 3 years

The project is administered and technically coordinated by IED. Major interest is in the influence of the oxy-fuel combustion on the state-of-the-art super-heater materials.

Contact person:  G. Stein-Brzozowska
Test Facilities: KSVA, BTS-VR
Beginning: 01.09.2009, time: 36 months

Biomass and alternative fuels
 

Subproject: Evaluation and prediction of deposition down to the cold end of the flue gas path in thermal power plants based on experiments, model development, and simulation

The VeRa project endeavors to further improve the predictive capacity of an engineering prediction tool and CFD sub models to validate the phenomena of slagging and fouling in boilers. It additionally seeks to study the buildup of condensates of water soluble corrosive phases resulting from biogenic (including bio-residues) and coal mixtures with high shares of biogenic fuels. The objective is to better understand the precursor boundary conditions for slagging and fouling from radiative, convective and cold end regions along the flue gas path of a combustion chamber. This is to facilitate the combustion of high fractions of biomass in co-firing scenarios, application of additive in combustion and even in cases of a complete substitution of coal with biomass in boilers (i.e 100% biomass combustion). These goals will be realized through an improved version of a deposition probe being developed and optimized at the institute. Validated engineering prediction tool complimented by high precision CFD sub models, thermochemical Oxide-Salt databank and as well as integrated slow reaction defining kinetics of salt condensation will form a reliable means to minimize problematic slagging and fouling events by optimally suggesting fuel mixtures and specifications based on fuel quality and operational boundary conditions of boilers.

Model development of both CFD and an engineering prediction tool for slagging and fouling are aided by series of test campaigns, methodical measurement and extensive data analysis in Labs and pilot scale facilities. Elaborate measurement campaigns in four different power plant boilers will provide the validation and prediction potentials of slagging and fouling for industry scale utility boilers.

The project is funded by BMWi (Federal Ministry of Economics and Technology) in close collaboration with active industry partners.

 

Contact persons:  A. Suso, P. Plaza, E. Miller, J. Maier, C. Baum

Test facility: KSVA, BTS, REM, Gas analytics, fuel analytics, Fuel scale measurement campaigns 

Beginning: 01.02.2021, duration: 48 months

During the combustion of pre-treated biomass with its high contents of chlorine and alkali as well as heavy metals, highly corrosive conditions prevail which place high demands on the installed metal components. The research focus of IFK in this BMWi (Federal Ministry for Economics and Technology) -funded project is the characterization of different pre-treated biomass fuels as well as their evaluation with regard to ash and deposit formation on flue gas side. The DECHEMA Research Institute concentrates on the further development and optimization of suitable coating processes for the protection of the metal surfaces against high-temperature corrosion.

Contact persons: E. Miller, J. Maier
Test Facility: KSVA
Beginning: 01.06.2016, time: 30 months
 

The use of biomass and bio-waste in coal-fired power plants is a recognized and important way to achieve the internationally agreed targets for reducing greenhouse gases. In this project on sustainability research with German and Polish partners, methods are to be developed for the pretreatment of biomass for greenhouse gas reduction technologies, in particular for combustion processes with biomass in power generation. The use of waste biomass instead of high quality woody biomass requires pretreatment to reduce adverse effects. The stringy and fibrous nature of the biomass complicates the milling process and co-incineration in existing coal dust mills and combustion systems. Other problems such as slagging and deposits are associated with the significant level of alkali metals in the biomass ash. These limitations require the development of a pre-treatment technique that improves and standardizes the biomass quality, so that it can be used as a substitute fuel for coal.

Contact persons:  A. Mack, J. Maier
Test Facilities: KSVA, BTS-VR
Beginning: 10.2016, time: 36 months

The main objective of the EU RFCS project BiOxySorb is an experimental and techno-economic assessment of 1st and 2nd generation biomass co-combustion under both air- and oxy-fuel conditions at various co-combustion ratios in combination with flexible, low cost SOx, HCl and Hg emission control by sorbent injection. The project is administered and technically coordinated by IFK.

Contact persons:  R. Spörl, J. Maier, A. Fuller
Test Facilities: KSVA, BTS-VR
Beginning: 01.07.2013, time: 36 months

The SECTOR project is focussed on the further development of torrefaction-based technologies for the production of solid bioenergy carriers up to pilot-plant scale and beyond, and on supporting the market introduction of torrefaction-based bioenergy carriers as a commodity (renewable solid fuel).
IFK is coordinating the end-use performance evaluation of these torrefaction-based bioenergy carriers considering four end-use options, starting from raw biomass to heat, electricity, biofuels, bio-chemicals and/or bio-materials.

Contact persons:  C. Ndibe, J. Maier
Test Facilities: KSVA, BTS-VR
Beginning: 01.12.2012, time: 36 months

The project is administered and technically coordinated by IVD. Major RTD topics are the development and demonstration of innovative approaches to the high efficient co-utilisation of low quality biomasses and Solid Recovered Fuels (SRF) produced from municipal solid waste (MSW) for electricity production and combined heat and power (CHP) usage, at competitive costs, high plant availability and advanced energy efficiency.

Contact persons:  B. Schwald, A. Fuller, E. Miller
Test Facilities: KSVA, BTS-VR
Beginning: 01.01.2010, time: 36 months

The project is administered and technically coordinated by IVD. The DEBCO project responds to the need for further operational experience in high share biomass co-firing using different type of fuels. The project aim to demonstrate and assess, on a long term basis, the advanced and innovative co-firing techniques that are capable of achieving higher shares of biomass up to 50% more on a thermal basis.

Contact persons:  B. Schwald, A. Fuller, G. Dunnu
Test Facilities: KSVA, BTS-VR
Beginning: 01.01.2008, time: 48 months

The focus of the project is to perform a techno-economic assessment of co-firing regionally available biomass fuels in coal-fired power plants. The project should clearly identify problems associated with co-firing at high thermal shares while also prescribing possible scenarios and to what extent biomasses can serve as substitute to coal in power plants. IFK is responsible for performing combustion tests and assessment of performance characteristics of various biomass fuels in cooperation with IET (Technical University Hamburg), who in addition to project coordination will perform detailed simulation and modeling in order to identify the best possible case scenarios for co-firing various biomasses in coal-fired power plants.

Contact persons:  C. Ndibe, M. Paneru, J. Maier
Test Facilities: KSVA, BTS-VR
Beginning: 01.12.2012, time: 36 months

The BioBoost project concentrates on dry and wet residual biomass and wastes as feedstock for de-central conversion by fast pyrolysis, catalytic pyrolysis and hydrothermal carbonisation to the intermediate energy carriers’ oil, coal or slurry. IFK is performing combustion test of the energy carriers produced from these processes (Bio-Char from pyrolysis and Bio-Coal from hydrothermal carbonisation process). Investigations will focus on the combustion/co-combustion performance and emission behavior. Moreover, fly ash and deposit characteristics regarding slagging fouling and corrosion will be evaluated.

Contact persons:  M. Paneru, J. Maier
Test Facilities: BTS-VR, KSVA
Beginning: 01.12.2012, time: 42 months

Contact persons:  D. Dunnu, J. Maier
Test Facilities: DIVA/ELWIRA
Beginning: 10.2012, time: 36 months

Pollutant formation and reduction
 

The main objective of the EU RFCS project BiOxySorb is an experimental and techno-economic assessment of 1st and 2nd generation biomass co-combustion under both air- and oxy-fuel conditions at various co-combustion ratios in combination with flexible, low cost SOx, HCl and Hg emission control by sorbent injection. The project is administered and technically coordinated by IFK.

Contact persons:  R. Spörl, J. Maier, A. Fuller
Test Facilities: KSVA, BTS-VR
Beginning: 01.07.2013, time: 36 months

Slagging, Fouling and Corrosion
 

Subproject: Evaluation and prediction of deposition down to the cold end of the flue gas path in thermal power plants based on experiments, model development, and simulation

The VeRa project endeavors to further improve the predictive capacity of an engineering prediction tool and CFD sub models to validate the phenomena of slagging and fouling in boilers. It additionally seeks to study the buildup of condensates of water soluble corrosive phases resulting from biogenic (including bio-residues) and coal mixtures with high shares of biogenic fuels. The objective is to better understand the precursor boundary conditions for slagging and fouling from radiative, convective and cold end regions along the flue gas path of a combustion chamber. This is to facilitate the combustion of high fractions of biomass in co-firing scenarios, application of additive in combustion and even in cases of a complete substitution of coal with biomass in boilers (i.e 100% biomass combustion). These goals will be realized through an improved version of a deposition probe being developed and optimized at the institute. Validated engineering prediction tool complimented by high precision CFD sub models, thermochemical Oxide-Salt databank and as well as integrated slow reaction defining kinetics of salt condensation will form a reliable means to minimize problematic slagging and fouling events by optimally suggesting fuel mixtures and specifications based on fuel quality and operational boundary conditions of boilers.

Model development of both CFD and an engineering prediction tool for slagging and fouling are aided by series of test campaigns, methodical measurement and extensive data analysis in Labs and pilot scale facilities. Elaborate measurement campaigns in four different power plant boilers will provide the validation and prediction potentials of slagging and fouling for industry scale utility boilers.

The project is funded by BMWi (Federal Ministry of Economics and Technology) in close collaboration with active industry partners.

 

Contact persons:  A. Suso, P. Plaza, E. Miller, J. Maier, C. Baum

Test facility: KSVA, BTS, REM, Gas analytics, fuel analytics, Fuel scale measurement campaigns 

Beginning: 01.02.2021, duration: 48 months

During the combustion of pre-treated biomass with its high contents of chlorine and alkali as well as heavy metals, highly corrosive conditions prevail which place high demands on the installed metal components. The research focus of IFK in this BMWi (Federal Ministry for Economics and Technology) -funded project is the characterization of different pre-treated biomass fuels as well as their evaluation with regard to ash and deposit formation on flue gas side. The DECHEMA Research Institute concentrates on the further development and optimization of suitable coating processes for the protection of the metal surfaces against high-temperature corrosion.

Contact persons: E. Miller, J. Maier
Test Facility: KSVA
Beginning: 01.06.2016, time: 30 months

The VerSi project aims at developing advanced slagging and fouling prediction and monitoring tools for large scale boilers. These include the improvement of the ash deposition on-line monitoring tool, development of the reliable engineering tool as well as development and validation of the CFD sub-models for more comprehensive simulations. The performance of the developed tool will be tested in two reference hard- and brown- coal fired power plant units. The project is funded by BMWi (Federal Ministry for Economics and Technology) and Industrial Partners involved in the project realization.

Contact persons: B. Schopfer, J. Maier
Beginning: 01.08.2015, time: 36 months

In this RFCS EU research project IED focusses on fireside high temperature corrosion attack against several alloys used in boilers in power plants under different emission regimes and fuels. The inferences should optimise prediction and avoiding of corrosive operation of coal-fired power plants by intelligent Sensing Systems.

Contact persons:  P. Winter, J. Maier
Test Facilities: BTS-VR, KSVA, laboratory testing, power plants
Beginning: July 2014, time: 48 months

 

 

Investigation of the physicochemical procedures during the transformation of the coal minerals and the reduction of fouling and slagging tendencies at the superheater tubes of modern power plants.

Contact person: S. Babat ,  O. Lemp
Test facilities: KSVA,  Power plants
Beginning: 01.01.2009, time: 4 years

The project is administered and technically coordinated by IVD. Major RTD topic is influence of supercritical steam parameters and the combustion atmosphere on the new state-of-the-art evaporator and superheater materials in both conventional air and oxy-fuel firings.

Contact persons:   G. Stein-Brzozowska,  O. Lemp
Test Facilities: KSVA, laboratory tests, long-time expositions, field measurements in power plants
Beginning: 01.01.2007, time: 4 years

The project is administered and technically coordinated by IVD. Major interest is in the influence of the oxy-fuel combustion on the state-of-the-art super-heater materials.

Contact person:  G. Stein-Brzozowska
Test Facilities: KSVA, BTS-VR
Beginning: 01.09.2009, time: 36 months

The project is administered and technically coordinated by IVD. The DEBCO project responds to the need for further operational experience in high share biomass co-firing using different type of fuels. The project aim to demonstrate and assess, on a long term basis, the advanced and innovative co-firing techniques that are capable of achieving higher shares of biomass up to 50% more on a thermal basis.

Contact persons:  B. Schwald, A. Fuller, G. Dunnu
Test Facilities: KSVA, BTS-VR
Beginning: 01.01.2008, time: 48 months

Operational Optimization of Existing Power Plants
 

Subproject: Evaluation and prediction of deposition down to the cold end of the flue gas path in thermal power plants based on experiments, model development, and simulation

The VeRa project endeavors to further improve the predictive capacity of an engineering prediction tool and CFD sub models to validate the phenomena of slagging and fouling in boilers. It additionally seeks to study the buildup of condensates of water soluble corrosive phases resulting from biogenic (including bio-residues) and coal mixtures with high shares of biogenic fuels. The objective is to better understand the precursor boundary conditions for slagging and fouling from radiative, convective and cold end regions along the flue gas path of a combustion chamber. This is to facilitate the combustion of high fractions of biomass in co-firing scenarios, application of additive in combustion and even in cases of a complete substitution of coal with biomass in boilers (i.e 100% biomass combustion). These goals will be realized through an improved version of a deposition probe being developed and optimized at the institute. Validated engineering prediction tool complimented by high precision CFD sub models, thermochemical Oxide-Salt databank and as well as integrated slow reaction defining kinetics of salt condensation will form a reliable means to minimize problematic slagging and fouling events by optimally suggesting fuel mixtures and specifications based on fuel quality and operational boundary conditions of boilers.

Model development of both CFD and an engineering prediction tool for slagging and fouling are aided by series of test campaigns, methodical measurement and extensive data analysis in Labs and pilot scale facilities. Elaborate measurement campaigns in four different power plant boilers will provide the validation and prediction potentials of slagging and fouling for industry scale utility boilers.

The project is funded by BMWi (Federal Ministry of Economics and Technology) in close collaboration with active industry partners.

 

Contact persons:  A. Suso, P. Plaza, E. Miller, J. Maier, C. Baum

Test facility: KSVA, BTS, REM, Gas analytics, fuel analytics, Fuel scale measurement campaigns 

Beginning: 01.02.2021, duration: 48 months

Due to the increasing share of renewable energy production and the necessity to reduce CO2 emissions, fossil fuel power plants face new challenges. In consequence, the plants are forced to follow a fluctuating demand and thus need to work in part load and with more frequent shutdown. To increase the efficiency and flexibility of fossil fuel power plants the FlexIgnite project funded by BMWi (Federal ministry of Economics and Technology) aims to improve the restart and min load operation by application of electrical ignition system such as plasma torches and heated nozzles. The electrical ignition system ignites directly the primary fuel i.e. coal to start the plant, which eliminates the utilization of costly natural gas or oil for startup.

Contact persons:  R. Youssefi, J. Maier
Test Facilities: KSVA
Beginning: 01.07.2016, time: 36 months

During the combustion of pre-treated biomass with its high contents of chlorine and alkali as well as heavy metals, highly corrosive conditions prevail which place high demands on the installed metal components. The research focus of IFK in this BMWi (Federal Ministry for Economics and Technology) -funded project is the characterization of different pre-treated biomass fuels as well as their evaluation with regard to ash and deposit formation on flue gas side. The DECHEMA Research Institute concentrates on the further development and optimization of suitable coating processes for the protection of the metal surfaces against high-temperature corrosion.

Contact persons: E. Miller, J. Maier
Test Facility: KSVA
Beginning: 01.06.2016, time: 30 months

The VerSi project aims at developing advanced slagging and fouling prediction and monitoring tools for large scale boilers. These include the improvement of the ash deposition on-line monitoring tool, development of the reliable engineering tool as well as development and validation of the CFD sub-models for more comprehensive simulations. The performance of the developed tool will be tested in two reference hard- and brown- coal fired power plant units. The project is funded by BMWi (Federal Ministry for Economics and Technology) and Industrial Partners involved in the project realization.

Contact persons: B. Schopfer, J. Maier
Beginning: 01.08.2015, time: 36 months
 

The use of biomass and bio-waste in coal-fired power plants is a recognized and important way to achieve the internationally agreed targets for reducing greenhouse gases. In this project on sustainability research with German and Polish partners, methods are to be developed for the pretreatment of biomass for greenhouse gas reduction technologies, in particular for combustion processes with biomass in power generation. The use of waste biomass instead of high quality woody biomass requires pretreatment to reduce adverse effects. The stringy and fibrous nature of the biomass complicates the milling process and co-incineration in existing coal dust mills and combustion systems. Other problems such as slagging and deposits are associated with the significant level of alkali metals in the biomass ash. These limitations require the development of a pre-treatment technique that improves and standardizes the biomass quality, so that it can be used as a substitute fuel for coal.

Contact persons:  A. Mack, J. Maier
Test Facilities: KSVA, BTS-VR
Beginning: 10.2016, time: 36 months

DRYLIG is an RFCS project focusing on use of pre-dried lignite for flexibility in power plants. Main scope of the project is the development of new and innovative retrofitting concepts for lignite pre-drying and pre-dried lignite co-firing. The proposed concepts are intended for existing lignite power plant (increase of flexibility, improved operational and environmental performance under low loads), hard coal plants (as start-up/co-firing fuel) and, finally, the enlargement of pre-dried lignite applications in other industrial applications. The research focus of IFK is:

  • Milling and drying experiments of low quality lignite containing high moisture and ash content in IFK´s fan beater mill facility
  • Small (20 kWth) and large (500 kWth) technical scale co-firing tests of pre-dried lignite & hard coal in different thermal shares to assess emission behavior, slagging and fouling, burnout and fly ash quality.

Bearbeiter: I. Papandreou, J. Maier
Versuchsanlagen:  Fan Beater Mill,   KSVA, BTS-VR
Projektstart: 01.07.2014, Laufzeit: 36 Monate

In this RFCS EU research project IFK focusses on fireside high temperature corrosion attack against several alloys used in boilers in power plants under different emission regimes and fuels. The inferences should optimise prediction and avoiding of corrosive operation of coal-fired power plants by intelligent Sensing Systems.

Contact persons:  P. Winter, J. Maier
Test Facilities: BTS-VR, KSVA, laboratory testing, power plants
Beginning: July 2014, time: 48 months

In the EU FP7 research project, IFK is involved in fuel, flame and combustion characterization and investigations of high temperature gas-side corrosion, flue gas clean-up and the behavior of mercury under oxy-fuel combustion conditions.

Contact persons:  M. Escoto de Tejada, J. Maier
Test Facilities: BTS-VR, KSVA
Beginning: 01.12.2011, time: 48 months

IIn this German federal research project, IFK investigates the influence of fuel composition and combustion conditions (air, oxy-fuel) on deposit and ash formation and transformation. Moreover, interactions between flue gases, deposits and heat exchanger materials are being evaluated.

Contact persons:  R. Spörl, M. Paneru
Test Facilities: KSVA, BTS-VR
Beginning: 01.04.2011, time: 36 months

The project is administered and technically coordinated by IVD. Major RTD topic is influence of supercritical steam parameters and the combustion atmosphere on the new state-of-the-art evaporator and superheater materials in both conventional air and oxy-fuel firings.

Contact persons:   G. Stein-Brzozowska,  O. Lemp
Test Facilities: KSVA, laboratory tests, long-time expositions, field measurements in power plants
Beginning: 01.01.2007, time: 4 years

Investigation of the physicochemical procedures during the transformation of the coal minerals and the reduction of fouling and slagging tendencies at the superheater tubes of modern power plants.

Contact person: S. Babat ,  O. Lemp
Test facilities: KSVA,  Power plants
Beginning: 01.01.2009, time: 4 years

Component and Burner Development and Testing
 

CEMCAP is an Horizon 2020 project regarding CCS technology development for cement production. IFK’s department Firing Systems is involved in the design, testing and optimization of an oxy-fuel burner as well as in the experimental investigation of entrained flow calcination under oxy-fuel conditions. The Decentralized Energy Conversion department of the IFK is also involved in the project with investigations on the Calcium Looping process.

Contact persons: F. Carrasco, J. Maier
Test Facilities: BTS-VR, KSVA
Beginning: 01.05.2015, time: 48 months

In the EU FP7 research project, IFK is involved in fuel, flame and combustion characterization and investigations of high temperature gas-side corrosion, flue gas clean-up and the behavior of mercury under oxy-fuel combustion conditions.

Contact persons:  M. Escoto de Tejada, J. Maier
Test Facilities: BTS-VR, KSVA
Beginning: 01.12.2011, time: 48 months

In this German federal research project, IED investigates the influence of fuel composition and combustion conditions (air, oxy-fuel) on deposit and ash formation and transformation. Moreover, interactions between flue gases, deposits and heat exchanger materials are being evaluated.

Contact persons:  R. Spörl, M. Paneru
Test Facilities: KSVA, BTS-VR
Beginning: 01.04.2011, time: 36 months

The project is administered and technically coordinated by IVD. Major RTD topics are combustion tests with different burner set-ups and validation and evaluation of burner set-ups (up to a scale of 30 MW) by using the IFK CFD combustion model AIOLOS.

Contact persons:  S. Grathwohl, J. Maier
Test Facilities: KSVA, BTS-VR
Beginning: 01.07.2006, time: 3 years

Contact

This image showsChristian Baum

Christian Baum

M.Sc.

Department Firing Systems (KWF)